Mozal Aluminium Smelter
Southern Africa's largest aluminium smelter — transforming Mozambique's industrial landscape.
Mozal (Mozambique Aluminium) is a large-scale aluminium smelter located in the Beluluane Industrial Park near Maputo, Mozambique. Originally a joint venture between BHP (now South32), Mitsubishi, the Industrial Development Corporation of South Africa, and the Government of Mozambique, the smelter was built in two phases. Phase I commenced production in 2000 and Phase II in 2003, bringing total capacity to approximately 563,000 tonnes of primary aluminium per year. The smelter draws power from the Cahora Bassa hydroelectric dam and uses alumina imported primarily from Australia. Mozal is the single largest industrial project in Mozambique's history and accounts for a significant share of the country's export revenue.
- 01Produce over 560,000 tonnes per year of primary aluminium ingots for global export markets
- 02Leverage Mozambique's abundant low-cost hydroelectric power for energy-intensive industrial production
- 03Diversify Mozambique's economy beyond agriculture and extractive resources
- 04Create sustained employment and skills development in modern heavy industry
- 05Generate significant export revenue and government fiscal receipts for Mozambique
- 06Serve as an anchor investment to attract further industrial development to the Beluluane Industrial Park
1998 · completed
Phase I Construction Begins
Construction of the first phase of the smelter begins in the Beluluane Industrial Park. Estimated cost of Phase I is $1.34 billion. BHP leads the consortium.
2000 · completed
Phase I First Metal Production
Mozal produces its first aluminium in June 2000, just 26 months after construction started — a record for a greenfield smelter. Phase I capacity of approximately 253,000 tonnes per year.
2003 · completed
Phase II Completion and Full Capacity
Phase II doubles smelter capacity to approximately 563,000 tonnes per year with the addition of a second potline. Total investment across both phases reaches $2.4 billion.
2014 · completed
Transfer to South32
BHP Billiton demerges its non-core assets into a new company called South32, which takes over BHP's majority stake in Mozal. South32 becomes the primary operator.
2020 · completed
Operational Optimisation
Mozal implements potline modernisation programs to improve current efficiency and reduce energy consumption per tonne of aluminium produced.
2025 · in progress
Continued Operations and Sustainability Focus
Mozal continues operating near nameplate capacity, contributing approximately 60% of Mozambique's manufacturing exports. Focus on renewable energy credentials given hydro-powered production.
Raw Material
Alumina Feedstock
Approximately 1.1 million tonnes per year of alumina imported primarily from Australia, delivered by bulk carrier to dedicated port facilities.
Energy Input
Hydroelectric Power
Approximately 900 MW of electricity drawn from the Mozambique grid, predominantly sourced from the 2,075 MW Cahora Bassa hydroelectric dam on the Zambezi River.
Processing Equipment
Reduction Potlines
Two potlines containing a total of 1,080 prebaked anode reduction cells operating at approximately 350 kA current intensity.
Processing Equipment
Anode Plant
On-site anode manufacturing facility producing prebaked carbon anodes from petroleum coke and coal tar pitch.
Logistics
Dedicated Port and Rail
Access to Maputo port facilities for alumina import and aluminium export. Connected by rail and road to the port.
- Hall-Heroult electrolytic reduction process with 1,080 prebaked anode reduction cells across two potlines
- Prebaked anode manufacturing facility producing carbon anodes on-site for the reduction process
- Cast house with multiple furnaces producing standard ingots, T-bars, and sow for export
- Advanced potline process control systems for optimising energy efficiency and aluminium quality
- Fume treatment centres with dry scrubbing systems for fluoride emission recovery and environmental control
- Direct current power supply infrastructure drawing from the Mozambique national grid (Cahora Bassa hydro)
What it means for the community
Mozal transformed Mozambique's industrial economy, accounting for approximately 7% of GDP and over 50% of total export revenue at peak. The smelter directly employs approximately 1,200 workers with over 90% being Mozambican nationals, and supports thousands of indirect jobs. Mozal was instrumental in developing the Beluluane Industrial Park into a major industrial zone and demonstrated the viability of large-scale industrial investment in post-conflict Mozambique. Its hydro-powered production gives it one of the lowest carbon footprints of any primary aluminium smelter globally.
No articles on this project yet. Subscribe to the newsletter to hear when one is published.
- South32 (47.1%)
- Mitsubishi (25%)
- IDC of South Africa (24%)
- Government of Mozambique (3.9%)
More in Ground
- EthiopiaTulu Kapi Gold ProjectEthiopia's first large-scale commercial gold mine — unlocking the country's mineral potential.
- Democratic Republic of CongoKamoa-Kakula Copper MineThe world's fastest-growing major copper mine, reshaping the DRC's mining landscape.
- Democratic Republic of CongoKibali Gold MineAfrica's largest gold mine, producing over 700,000 ounces annually from the heart of the DRC.