Science stories from Africa Now showing
OngoingDraft · awaiting verification

Kamoto Copper Mine

One of the world's largest copper-cobalt producers, anchoring Glencore's operations in the DRC's Katanga province.

Explainer film in production
§ 01About the project

Kamoto Copper Company (KCC) operates one of the largest copper-cobalt mining complexes in the world, located near Kolwezi in the DRC's Lualaba Province. The operation is 75% owned by Glencore (through its subsidiary Katanga Mining) and 25% by state-owned Gecamines. KCC comprises the Kamoto underground mine, the KOV and Mashamba East open pits, a concentrator, and a modern hydrometallurgical processing plant. The complex produced approximately 250,000 tonnes of copper cathode and significant cobalt output in 2023, making it one of the DRC's largest mining operations.

§ 02What it aims to do
  1. 01Produce over 250,000 tonnes of copper cathode and significant cobalt volumes annually
  2. 02Operate the whole-ore leach hydrometallurgical plant at design capacity
  3. 03Maintain the Kamoto underground mine as a long-life core operation
  4. 04Supply battery-grade cobalt hydroxide to the global electric vehicle supply chain
  5. 05Comply with DRC mining code requirements including local content and community investment
  6. 06Implement responsible sourcing standards for cobalt traceability
§ 03Milestones
  1. 2008 · completed

    Glencore Joint Venture

    Glencore (via Katanga Mining) finalized its joint venture with Gecamines for the Kamoto complex.

  2. 2014 · completed

    Underground Expansion

    Major underground expansion work at Kamoto mine to increase ore production capacity.

  3. 2018 · completed

    Whole Ore Leach Plant

    The $900 million whole-ore leach hydrometallurgical plant was commissioned.

  4. 2019 · completed

    Temporary Suspension

    Operations were temporarily suspended due to a sinkhole incident at the KOV open pit.

  5. 2023 · completed

    Full Production

    KCC produced approximately 250,000 tonnes of copper cathode at strong operating margins.

  6. 2025 · in progress

    Continued Optimization

    Ongoing optimization of the hydrometallurgical plant and underground mining operations.

§ 04Engineering & resources

Mineral Resource

Copper-Cobalt Resource

Massive copper-cobalt mineral resource base with reserves supporting decades of production.

Processing Plant

Hydrometallurgical Plant

A modern whole-ore leach, SX-EW plant producing LME-grade copper cathode and cobalt hydroxide.

Mining Infrastructure

Kamoto Underground Mine

One of the deepest and largest underground copper mines in the DRC, with extensive development levels.

Mining Infrastructure

KOV and Mashamba East Pits

Open-pit operations providing supplementary oxide and mixed ore to the processing plant.

Processing Plant

Concentrator Plant

Flotation concentrator producing copper-cobalt concentrate from sulphide ore sources.

  • Underground room-and-pillar and sublevel stoping mining
  • Open-pit conventional mining at KOV and Mashamba East
  • Whole-ore leach hydrometallurgical processing
  • Solvent extraction and electrowinning (SX-EW) for copper cathode
  • Cobalt hydroxide precipitation circuit
  • Tailings retreatment through dedicated leach circuits

What it means for the community

KCC employs over 8,000 people directly and is one of the largest private sector employers in the Lualaba Province. The operation contributes hundreds of millions of dollars annually to the DRC government through taxes, royalties, and Gecamines' 25% interest. Glencore has implemented responsible cobalt sourcing protocols including blockchain traceability to ensure cobalt produced at Kamoto meets international ethical supply chain standards.

§ 05Articles

No articles on this project yet. Subscribe to the newsletter to hear when one is published.

§ 06Partners & owners
  • Glencore/Katanga Mining (75%)
  • Gecamines (25%)